What applies locally
An ARU is a self-contained dwelling associated with eligible detached, semi-detached or street-townhouse housing, either within the main building or within an accessory building.
St. Thomas publishes a 2026 additional residential unit guidebook for homeowners.
St. Thomas publishes a 2026 additional residential unit guidebook for homeowners.
An ARU is a self-contained dwelling associated with eligible detached, semi-detached or street-townhouse housing, either within the main building or within an accessory building.
The guide is not a zoning approval for a parcel. Check the local lot and zone, access, water/sewer service, parking, building code and permit before creating an internal or detached unit.
Before work begins: confirm the lot’s actual zoning, mapped overlays, legal parcel characteristics, servicing and applicable building permit conditions with the municipality.
Indexing: City guide: enacted rules summarized; parcel permit not verified. This page is information, not municipal permission for a specific address.
Enter a street address. We’ll match it to St. Thomas and show available municipal planning information that requires independent verification.
Uses Natural Resources Canada’s national Geolocator to match the address. Any planning result is preliminary and must be checked against the current municipal bylaw and permit office.
Neighbouring communities in Central Ontario can implement additional housing differently. Keep the municipal portion of the check specific to St. Thomas.
This is the simple build-direction summary. The exact property still has to meet its zoning, site, servicing and permit requirements.
Before you build: confirm the exact property, zoning and permit path with St. Thomas.
This preliminary guide does not answer whether a particular parcel is approved. The next two steps are budgeting and contractor scoping; neither replaces municipal approval.
Planning sequence: rules → budget → written scope / contractor. Cost models and contractor matching do not determine whether the municipality will approve the work.
Guide verification: Official-source research summary. This guide provides linked municipal research; a complete enacted-bylaw, zoning-map and amendment cross-check has not been documented for this municipality.
Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →
Checked against municipality-published material: The City publishes its 2026 ARU Guidebook and defines internal, attached and detached ARUs for qualifying residential properties.
Outstanding: Check the guidebook against adopted zoning, number-of-unit and lot design requirements and property permits; a guidebook is not a full legal signoff.
Verification status: Targeted municipal-source check completed. This is not an independent certification of all enacted bylaw amendments, zoning maps or any individual property.
Municipal adoption / zoning evidence reviewed October 8, 2026 ↗
Reviewed October 8, 2026. Check the current bylaw and the mapped parcel directly with municipal planning before constructing or legalizing housing.