Permission first. Construction second.

Peterborough has a dedicated ARU permit page applying Zoning Bylaw 1997-123. The right answer still depends on your property and the proposed dwelling form.

Main home
Secondary / ADU
One property · more than one approval layer
Property address check

Check a Peterborough property by address.

Use the address tool to locate the property. Municipal zoning, parcel overlays and permits must be verified independently; this guide is not a permit decision. Last source review: 2026-10-09.

Address matching is not zoning certification. A municipality must confirm zoning and any relevant lot restrictions.

Municipal source reviewReviewed 9 October 2026

Short answer

Peterborough has a dedicated ARU permit page applying Zoning Bylaw 1997-123.

What local rules actually say

On eligible single-detached, semi-detached and row-dwelling properties, the city outlines two configurations: two internal ARUs, or one internal ARU plus one in an accessory building. These are additional to a qualifying principal home.

Important exceptions and the next step

Each ARU must be smaller than the principal unit and may have at most two bedrooms per the city guidance; servicing, zoning compliance, building approvals and rental-licence conditions must be checked.

How to verify an individual property

  1. Look up the legal property address and zone on the official Peterborough zoning map.
  2. Confirm the proposed dwelling type: internal suite, addition, detached garden home or multiplex; these can follow different rules.
  3. Verify zone exceptions, lot size, servicing, hazard/heritage limits, any registered restrictions and the current amending bylaws.
  4. Ask the local planning/building office for the required written zoning confirmation and building permits before commissioning construction.
Can you build here?

What to verify before building in Peterborough.

This is the simple build-direction summary. The exact property still has to meet its zoning, site, servicing and permit requirements.

Internal additional unitConditional — verify
Detached garden / backyard unitConditional — verify
DuplexProperty-specific
TriplexProperty-specific
FourplexProperty-specific

Before you build: confirm the exact property, zoning and permit path with Peterborough.

Next planning steps

Confirm the property rules, then plan your project costs.

Official sources explain the possible permission paths; a property-level zoning review comes before budgeting and contractor quotes.

Planning sequence: rules → budget → written scope / contractor. Cost models and contractor matching do not determine whether the municipality will approve the work.

Municipal evidence check — October 12, 2026

Checked against municipality-published material: The City provides a dedicated ARU construction-permit process; this is building guidance, not evidence that any particular lot meets the current zoning schedule.

Outstanding: Current zoning bylaw and map, any updates, utilities, entrance access, permit requirements and applicable heritage controls.

Verification status: Targeted municipal-source check completed. This is not an independent certification of all enacted bylaw amendments, zoning maps or any individual property.

How this guide was verified

Guide verification: Official-source research summary. This guide provides linked municipal research; a complete enacted-bylaw, zoning-map and amendment cross-check has not been documented for this municipality.

Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →

Official sources