Permission first. Construction second.

Another dwelling on one property is both a planning question and a building-safety question. Do not collapse them into one permit check. London’s ARU guidance covers interior conversions, additions, garage conversions and detached units. A March 2026 bylaw amending ARU bedroom counts and unit size was appealed; the City states Interim Control By-law CP-1600-300 remains relevant while the appeal is unresolved. The city warns that not every lot qualifies; setbacks, lot dimensions, coverage, parking and current zoning have to be checked before the permit application.

Main home
Secondary / ADU
One property · more than one approval layer
Property address check

Check a London property by address.

Enter a street address. We will identify the municipality from the address; the zoning and approval status of this property still require a separate municipal check.

Uses Natural Resources Canada’s national Geolocator to match the address. The rule result comes from SuiteRulesCanada’s audited municipal source set.

Dedicated suite/ADU sourceReviewed 2026-09-20

Start with London’s current suite guidance

Open the official London suite source ↗

The broader Southwestern Ontario housing pattern does not replace the London approval file. Confirm this address and unit type with the local source.

Ontario: the provincial layer

The Ontario ARU framework can support as many as three units in the principal house, or two principal-house units plus one ancillary-building unit, on identified lands. Municipal zoning still controls site details.

Ontario additional residential unit framework ↗

Before applying in London

Confirm the zone, lot configuration, setbacks, parking and access for the exact address.

A building permit still has to address construction and safety requirements; a general citywide allowance is not a permit.

Can you build here?

What to verify before building in London.

This is the simple build-direction summary. The exact property still has to meet its zoning, site, servicing and permit requirements.

Internal additional unitConditional — verify
Detached garden / backyard unitConditional — verify
DuplexProperty-specific
TriplexProperty-specific
FourplexProperty-specific

Before you build: confirm the exact property, zoning and permit path with London.

Next planning steps

Confirm local zoning before you estimate project costs.

This guide explains the municipal process, not whether your specific property is approved. The next two steps are budgeting and contractor scoping; neither replaces municipal approval.

Planning sequence: rules → budget → written scope / contractor. Cost models and contractor matching do not determine whether the municipality will approve the work.

Municipal zoning: verified research register

Governing municipal bylaw: Zoning Bylaw Z.-1; 2026 parking amendments

Suite and ADU rules: Eligible lots may allow four residential units. No additional parking is required for ARUs under current City guidance; verify driveway/access and site-specific constraints. Interim Control Bylaw CP-1600-300 temporarily limits ARU bedrooms and size while the permanent amendment is under appeal.

Provincial versus local rules: Provincial ARU legislation does not establish property-specific permission. Requires manual municipal check for zoning overlays and any appealed amendment.

Earlier municipal research notes (5)

Municipal evidence check · October 12, 2026

Confirmed for this claim: London’s March 3, 2026 ARU bedroom/size restriction amendment was appealed. The City says Interim Control By-law CP-1600-300 remains applicable while appeals are unresolved; therefore the proposed/adopted restrictions must not be presented as ordinary final zoning provisions without the interim-control context.

Still to verify: Verify current interim-control period, any Ontario Land Tribunal disposition and site-specific effect, alongside consolidated Z.-1 zoning and ARU permit conditions.

This is a targeted official-source review, not complete certification of every adopted amendment or approval for your property.

How this guide was verified

Guide verification: Targeted municipal-source claim check recorded. This guide provides linked municipal research; a complete enacted-bylaw, zoning-map and amendment cross-check has not been documented for this municipality.

Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →

Official sources

City of London — additional residential units ↗

City of London — zoning information ↗

Ontario — Planning Act ↗

Municipal requirements and appeal status may change. Confirm the operative zoning by-law and any applicable tribunal decision before relying on a parcel count.