Start with Barrie’s current suite guidance
Open Barrie’s current ARU rules ↗Housing changes elsewhere in Central Ontario do not establish permission on this parcel. Use the Barrie zoning and permit route for the local answer.
Ontario: the provincial layer
For Ontario properties covered by the ARU framework, the provincial layer generally enables three units in the main residence or two there plus one in an accessory building. The municipality still applies its zoning and permit standards.
Ontario additional residential unit framework ↗What the Barrie source actually tells you
The Barrie link is topic-specific, so it is the strongest local starting point for this page rather than a generic city homepage. The verified local material specifically points toward servicing and zoning.
- Barrie’s current zoning material allows additional residential units on qualifying residential lots and sets a maximum of four residential units in total, including the principal unit.
- The city’s ARU standards include an unobstructed path of travel to the additional unit and restrict units in areas subject to natural hazards such as flooding or erosion.
- Barrie also has a separate 2026 ARU permit-fee incentive. Treat that program as a financing/fee item, not as proof that a specific property is approved.