Home/Cities/New Brunswick/Saint John
Saint John, NB suite & ADU rules

Permission first. Construction second.

The city’s July 2025 office-consolidated zoning bylaw contains secondary-suite, garden-suite and zone provisions. The right answer still depends on your property and the proposed dwelling form.

Main home
Secondary / ADU
One property · more than one approval layer
Property address check

Check a Saint John property by address.

Use the address tool to locate the property. Municipal zoning, parcel overlays and permits must be verified independently; this guide is not a permit decision. Last source review: 2026-10-09.

Address matching is not zoning certification. A municipality must confirm zoning and any relevant lot restrictions.

Municipal source reviewReviewed 9 October 2026

Short answer

The city’s July 2025 office-consolidated zoning bylaw contains secondary-suite, garden-suite and zone provisions.

What local rules actually say

The City adopted zoning reform C.P. 111-183 on January 13, 2025, and its July 2025 office consolidation reflects that reform. Section 9.13 regulates secondary suites where permitted, including owner-occupancy, size and servicing conditions. The reform also provides additional low-rise housing and accessory-dwelling paths, but the precise permitted unit mix depends on the current zone and sections of the enacted bylaw, not an across-the-board entitlement.

Important exceptions and the next step

Confirm the parcel’s zone and permitted uses, parking and services, and whether later amendments have changed sections 9.8 (garden suites) or 9.13 (secondary suites). The July 2025 office-consolidated zoning text at section 9.8(j) expressly prohibits a secondary suite in any building on a lot containing a garden suite. A municipal announcement describes broader accessory-dwelling options but is not a substitute for the adopted zoning text. Unless a later enacted amendment expressly changes section 9.8(j), treat the garden-suite/secondary-suite combination as prohibited and ask the City to confirm its currently operative provisions.

How to verify an individual property

  1. Look up the legal property address and zone on the official Saint John zoning map.
  2. Confirm the proposed dwelling type: internal suite, addition, detached garden home or multiplex; these can follow different rules.
  3. Verify zone exceptions, lot size, servicing, hazard/heritage limits, any registered restrictions and the current amending bylaws.
  4. Ask the local planning/building office for the required written zoning confirmation and building permits before commissioning construction.
Can you build here?

What to verify before building in Saint John.

This is the simple build-direction summary. The exact property still has to meet its zoning, site, servicing and permit requirements.

Internal additional unitConditional — verify
Detached garden / backyard unitConditional — verify
DuplexProperty-specific
TriplexProperty-specific
FourplexProperty-specific

Before you build: confirm the exact property, zoning and permit path with Saint John.

Next planning steps

Confirm the property rules, then plan your project costs.

Official sources explain the possible permission paths; a property-level zoning review comes before budgeting and contractor quotes.

Planning sequence: rules → budget → written scope / contractor. Cost models and contractor matching do not determine whether the municipality will approve the work.

How this guide was verified

Guide verification: Targeted municipal source review documented. Selected rule or adoption claims were checked against named official material and recorded in the site research notes. This is not a complete current bylaw, zoning-map or amendment certification.

Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →

Official sources

Reviewed 9 October 2026. Municipal guides describe published rules only. Source consolidations may not include the latest adopted amendment. No site-specific approval is represented.

V69.62 targeted primary-source review · October 12, 2026: City posted a notice of a planned January 13, 2025 third reading of amendment C.P. 111-183; the notice by itself does not prove passage. The July 2025 office consolidation is a useful but non-certified reference. Official municipal record ↗ Still unverified: Reconcile signed adopted text and post-July-2025 amendments before concluding owner occupancy, suite size or expanded housing permissions. No comprehensive current-by-law signoff or parcel approval is claimed.