Home / Cities / British Columbia / Port Coquitlam
Port Coquitlam, BC suite & ADU rules

Permission first. Construction second.

Port Coquitlam’s current SSMUH page says properties in residential small-scale zones can support three to six units depending on lot size, location and proximity to transit. The City also publishes separate secondary-suite and ADU permit guidance.

Main home
Secondary / ADU
One property · more than one approval layer
Interactive property lookup

Enter your address and see what your property may allow.

Select a B.C. property to check the parcel, available zoning and suite-planning data.

Enter a house number and street name to see matching B.C. addresses.

Before relying on this result, verify the property details.

The automated checker cannot confirm all zoning amendments, overlays, lot restrictions, servicing or building permits. Free human property-review requests are currently paused.

See the official verification steps →
Can’t find your address?

Use the manual property check below.

Start with the municipality and parcel area. The manual check stays open here, but the questions are split into 4 short steps so you do not have to scroll through everything at once.

Manual property check

Check the lot using what you know.

Four short steps. Answer what you know and choose “Not sure” for anything you have not checked.

Step 1 of 4Property basics
Step 1: Property basics

Use the parcel area from your property record, assessment or municipal mapping tool.

This does not change the provincial unit-count math. It only tailors the next-step checklist in your result.

Step 2: Basic zoning checks

If you do not know the zoning, choose Not sure.

What does this mean?

If you have never checked this on a municipal map or plan, choose Not sure.

Why are we asking?

Think houses, duplexes or small multiplexes. If you only know the zone code, choose Not sure.

Step 3: Possible exceptions

This is about subdivision rules, not the size of your current lot. Choose Not sure unless you know.

A TOA is a special mapped area around major transit. If you have never checked the map, choose Not sure.

Choose Yes only if the municipality has specifically confirmed it. Otherwise choose Not sure.

Step 4: Frequent bus check

If you have not checked an official map, choose Not sure.

Private by default: the calculation runs in your browser. No name, phone number or email is required.

Calculator loading…

Municipal rules · reviewed September 28, 2026

Port Coquitlam: the local rules that change the property answer

Port Coquitlam has a well-defined RS1–RS4 SSMUH framework plus separate secondary-suite and ADU permit routes. The prior generic page understated how much property-specific information the City already publishes.

1. RS1–RS4 SSMUH

  • The City permits SSMUH on RS1, RS2, RS3 and RS4 properties. It describes 3 to 6 units depending on lot size, location and transit proximity, with no rezoning needed for the qualifying SSMUH path.
  • The exact unit count still depends on the actual parcel; do not apply the maximum to every RS-zoned lot.

2. Secondary suites

  • Port Coquitlam’s building page says secondary suites are permitted in RS1–RS4 zones and require a Building Permit. The page is specifically a permit/code route for an internal suite.
  • This is separate from the detached ADU development-permit route.

3. Detached ADU / coach house

  • An ADU is a detached accessory dwelling at the rear of an RS-zoned lot. The City’s current ADU page caps the dwelling at 90 m² and sets access/siting standards.
  • New ADUs require a SSMUH Development Permit before a Building Permit; a watercourse within 50 m can trigger a separate Watercourse Protection Development Permit check.

4. Development Permit sequence

  • New duplexes, ADUs and developments with 3 or more dwellings require an SSMUH Development Permit before the Building Permit is issued.
  • The City does not publish one universal approval time on these pages, so this guide should not invent a “typical 4–6 week” review period.

Port Coquitlam property-check FAQ

Does a Port Coquitlam secondary suite use the same permit as an ADU?

No. Internal secondary suites use the building-permit route; detached ADUs and new duplex/3+ unit forms use the SSMUH Development Permit process before the Building Permit.

Can an ADU itself contain a secondary suite?

The current ADU page says it cannot contain a secondary suite.

How this guide was verified

Guide verification: Official-source research summary. This guide provides linked municipal research; a complete enacted-bylaw, zoning-map and amendment cross-check has not been documented for this municipality.

Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →

Official Port Coquitlam sources

Rule sources used for this municipal guide.

Reviewed September 28, 2026. These links are the planning starting point; current parcel zoning, title constraints, servicing and permit requirements can still change the answer.

V69.61 targeted primary-source review · October 12, 2026: Official RS1-RS4 guidance permits conditional 3–6 SSMUH units but specifically excludes RS parcels within a designated transit-oriented area from that SSMUH route; new duplexes/ADUs and 3+ units generally require a development permit. Official municipal record ↗ Not yet verified: Check PoCoMAP, any restrictive covenants, watercourse development permit and current DCC/permit schedules. No comprehensive current-by-law signoff or parcel approval is claimed.