What applies locally
The rural large-lot R2 schedule contains a secondary-suite restriction on lots below one hectare unless a qualified wastewater professional supplies specified septic-capacity evidence.
Coldstream Zoning Bylaw 1838 contains zone-specific accessory dwelling and secondary-suite rules.
Coldstream Zoning Bylaw 1838 contains zone-specific accessory dwelling and secondary-suite rules.
The rural large-lot R2 schedule contains a secondary-suite restriction on lots below one hectare unless a qualified wastewater professional supplies specified septic-capacity evidence.
An amnesty process for existing suites is not equivalent to approval for new construction. Confirm zone, sewage system, lot area, parking, permit requirements and any municipal exceptions.
Before work begins: confirm the lot’s actual zoning, mapped overlays, legal parcel characteristics, servicing and applicable building permit conditions with the municipality.
Indexing: City guide: enacted rules summarized; parcel permit not verified. Municipal guidance is a starting point, not a property approval. This page is not municipal permission for a specific address.
Select a B.C. property to check the parcel, available zoning and suite-planning data.
Start with the municipality and parcel area. The manual check stays open here, but the questions are split into 4 short steps so you do not have to scroll through everything at once.
Four short steps. Answer what you know and choose “Not sure” for anything you have not checked.
This is the simple build-direction summary. The exact property still has to meet its zoning, site, servicing and permit requirements.
Before you build: confirm the exact property, zoning and permit path with Coldstream.
Use these tools only after confirming the municipal path. Cost planning and contractor matching do not establish zoning, code compliance or permit approval.
Guide verification: Targeted official-source claim check (12 October 2026); not a comprehensive enacted-bylaw signoff. The identified claim is supported by or compared with the linked official source, subject to the verification limitations below.
Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →
Reviewed October 8, 2026. Check the current bylaw and the mapped parcel directly with municipal planning before constructing or legalizing housing.
Official-source claim check · 12 October 2026: Bylaw 1838 R2 s.502.6(5) imposes additional registered wastewater-professional evidence for an internal suite on lots below 1 ha. Official municipal evidence ↗ Remaining verification: Post-publication amendments and the property wastewater survey/certificate were not independently confirmed.