Home / Cities / British Columbia / City of North Vancouver
City of North Vancouver, BC suite & ADU rules

Permission first. Construction second.

The City of North Vancouver has been updating its zoning in response to provincial small-scale multi-unit housing requirements. Current City material also identifies secondary suites, coach houses and multiplex construction as permit pathways.

Main home
Secondary / ADU
One property · more than one approval layer
Interactive property lookup

Enter your address and see what your property may allow.

Select a B.C. property to check the parcel, available zoning and suite-planning data.

Enter a house number and street name to see matching B.C. addresses.

Before relying on this result, verify the property details.

The automated checker cannot confirm all zoning amendments, overlays, lot restrictions, servicing or building permits. Free human property-review requests are currently paused.

See the official verification steps →
Can’t find your address?

Use the manual property check below.

Start with the municipality and parcel area. The manual check stays open here, but the questions are split into 4 short steps so you do not have to scroll through everything at once.

Manual property check

Check the lot using what you know.

Four short steps. Answer what you know and choose “Not sure” for anything you have not checked.

Step 1 of 4Property basics
Step 1: Property basics

Use the parcel area from your property record, assessment or municipal mapping tool.

This does not change the provincial unit-count math. It only tailors the next-step checklist in your result.

Step 2: Basic zoning checks

If you do not know the zoning, choose Not sure.

What does this mean?

If you have never checked this on a municipal map or plan, choose Not sure.

Why are we asking?

Think houses, duplexes or small multiplexes. If you only know the zone code, choose Not sure.

Step 3: Possible exceptions

This is about subdivision rules, not the size of your current lot. Choose Not sure unless you know.

A TOA is a special mapped area around major transit. If you have never checked the map, choose Not sure.

Choose Yes only if the municipality has specifically confirmed it. Otherwise choose Not sure.

Step 4: Frequent bus check

If you have not checked an official map, choose Not sure.

Private by default: the calculation runs in your browser. No name, phone number or email is required.

Calculator loading…

Municipal rules · reviewed September 28, 2026

City of North Vancouver: the local rules that change the property answer

The City adopted a new Ground Oriented Zone on December 8, 2025. Properties in that zone use the new 4/6-unit framework; older secondary-suite/coach-house guidance still applies to properties outside the Ground Oriented Zone.

1. Ground Oriented Zone

  • The new Ground Oriented Zone permits up to 4 dwelling units per lot and up to 6 in identified central areas. The City lists single-detached homes with or without a suite/coach house, duplexes with or without suites, and multiplex/townhome forms among the permitted development types.
  • Use the City’s current map/framework to determine whether a parcel is in the 4- or 6-unit area; do not infer that from the municipality name alone.

2. Non-Ground-Oriented secondary suites

  • For properties outside the Ground Oriented Zone, the City’s secondary-suite page states that one suite is permitted on a single-family property and may be combined with an accessory coach house.
  • That page also states an owner-residency requirement. It explicitly warns that its rules do not apply to Ground Oriented Zone properties.

3. Coach house / permit path

  • Outside the new GO zone, coach-house applications use zoning, Development Permit and Building Permit requirements. In the GO zone, the City directs applicants to the Ground Oriented Housing application process instead.
  • The site should route users to the correct branch rather than mixing pre-GO and GO rules.

4. Property-level uncertainty

  • The municipality alone is insufficient to determine the unit count. The current zone/GO status and any applicable development-permit or site constraints must be confirmed.
  • A hard PERMITTED status should require authoritative zoning evidence, especially because the old and new rule sets coexist.

City of North Vancouver property-check FAQ

Does the old CNV secondary-suite page apply inside the Ground Oriented Zone?

No. The City expressly says that page does not apply to properties in the Ground Oriented Zone.

Can a non-GO single-family lot have a suite and coach house?

The City’s current legacy secondary-suite page says one suite may be combined with an accessory coach house, subject to current zoning and permit requirements.

How this guide was verified

Guide verification: Targeted official-source claim check (12 October 2026); not a comprehensive enacted-bylaw signoff. The identified claim is supported by or compared with the linked official source, subject to the verification limitations below.

Property confidence: Not assessed. City-wide guidance does not confirm permission for a particular parcel. Check official zoning, overlays and permits. How verification works →

Official City of North Vancouver sources

Rule sources used for this municipal guide.

Reviewed September 28, 2026. These links are the planning starting point; current parcel zoning, title constraints, servicing and permit requirements can still change the answer.

Official-source claim check · 12 October 2026: City official suite page confirms the December 8, 2025 Ground Oriented Zone and expressly excludes those parcels from older suite guidance; older-zone coach and suite guidance requires a separate path. Official municipal evidence ↗ Remaining verification: Ground Oriented Zone map, 2026 amendments and parcel eligibility require a zoning search; broad density values not certified.