Lot-size band
Up to 280 m² is the 3-unit band. Above 280 m² is the 4-unit band, unless the 6-unit frequent-bus test applies. A parcel larger than 4,050 m² is exempt from the provincial 3 / 4 / 6 requirement.
Start with the municipality and street address. The report combines the parcel match, provincial SSMUH starting point, available local mapping and the remaining checks that still need municipal confirmation.
Select a B.C. property to check the parcel, available zoning and suite-planning data.
Start with the municipality and parcel area. The manual check stays open here, but the questions are split into 4 short steps so you do not have to scroll through everything at once.
Four short steps. Answer what you know and choose “Not sure” for anything you have not checked.
Up to 280 m² is the 3-unit band. Above 280 m² is the 4-unit band, unless the 6-unit frequent-bus test applies. A parcel larger than 4,050 m² is exempt from the provincial 3 / 4 / 6 requirement.
The lot also has to be in the statutory geographic scope and a Restricted Zone, with residential use permitted. Water/sewer, subdivision-lot-size, TOA, heritage and qualifying hazard exemptions can change the result.
Even a 3 / 4 / 6-unit zoning baseline is not a building approval. The result now turns your project goal into a practical next-step checklist, but local setbacks, lot coverage, height, access, servicing, covenants, Building Code and permits still control buildability.